.. _lbl-dldb_damage_FEMA_P58_2nd_D_10_14 *************************** D.10.14 - Elevators & Lifts *************************** The following models are available: .. raw:: html

D.10.14.011 | Traction Elevator – Applies to most California Installations 1976 or later, most western states installations 1982 or later and most other U.S installations 1998 or later.

| Costing per elevator. Elevator demand parameter shall be defined as the peak floor acceleration at the first floor. The elevator fragility for a multiple story building should only be entered once on the first floor. | Construction Quality: Any Suggested Block Size: 1 EA The following repair consequences are available for this model: **Carbon** .. raw:: html :file: D.10.14.011-Carbon.html **Cost** .. raw:: html :file: D.10.14.011-Cost.html **Energy** .. raw:: html :file: D.10.14.011-Energy.html **Time** .. raw:: html :file: D.10.14.011-Time.html .. raw:: html
.. raw:: html

D.10.14.012 | Traction Elevator – Applies to most California Installations prior to 1976, most western states installations prior to 1982 and most other U.S installations prior to 1998.

| Costing per elevator. Elevator demand parameter shall be defined as the peak floor acceleration at the first floor. The elevator fragility for a multiple story building should only be entered once on the first floor. | Construction Quality: Any Suggested Block Size: 1 EA The following repair consequences are available for this model: **Carbon** .. raw:: html :file: D.10.14.012-Carbon.html **Cost** .. raw:: html :file: D.10.14.012-Cost.html **Energy** .. raw:: html :file: D.10.14.012-Energy.html **Time** .. raw:: html :file: D.10.14.012-Time.html .. raw:: html
.. raw:: html

D.10.14.021 | Hydraulic Elevator – Applies to most California Installations 1976 or later, most western states installations postdating 1982 and most U.S installations postdating 1998.

| Costing per elevator. Elevator demand parameter shall be defined as the peak floor acceleration at the first floor. The elevator fragility for a multiple story building should only be entered once on the first floor. | Construction Quality: Any Suggested Block Size: 1 EA The following repair consequences are available for this model: **Carbon** .. raw:: html :file: D.10.14.021-Carbon.html **Cost** .. raw:: html :file: D.10.14.021-Cost.html **Energy** .. raw:: html :file: D.10.14.021-Energy.html **Time** .. raw:: html :file: D.10.14.021-Time.html .. raw:: html
.. raw:: html

D.10.14.022 | Hydraulic Elevator – Applies to most California Installations prior to 1976, most western states installations prior to 1982 and most U.S installations prior to 1998.

| Costing per elevator. Elevator demand parameter shall be defined as the peak floor acceleration at the first floor. The elevator fragility for a multiple story building should only be entered once on the first floor. | Construction Quality: Any Suggested Block Size: 1 EA The following repair consequences are available for this model: **Carbon** .. raw:: html :file: D.10.14.022-Carbon.html **Cost** .. raw:: html :file: D.10.14.022-Cost.html **Energy** .. raw:: html :file: D.10.14.022-Energy.html **Time** .. raw:: html :file: D.10.14.022-Time.html .. raw:: html