.. _lbl-dldb_damage_FEMA_P58_2nd_D_50_11 ********************************************************** D.50.11 - Electrical Service & Distribution - High Tension ********************************************************** The following models are available: .. raw:: html

D.50.11.011a | Transformer/primary service - Capacity: <100 kVA - Unanchored equipment that is not vibration isolated - Equipment fragility only

| Costing is per unit and is based upon 75 kVa. | Construction Quality: Normal - Not designed for seismic loads | Seismic Installation Conditions: Unanchored equipment that is not vibration isolated Suggested Block Size: 1 EA The following repair consequences are available for this model: **Carbon** .. raw:: html :file: D.50.11.011a-Carbon.html **Cost** .. raw:: html :file: D.50.11.011a-Cost.html **Energy** .. raw:: html :file: D.50.11.011a-Energy.html **Time** .. raw:: html :file: D.50.11.011a-Time.html .. raw:: html
.. raw:: html

D.50.11.011b | Transformer/primary service - Capacity: 100 to <350 kVA - Unanchored equipment that is not vibration isolated - Equipment fragility only

| Costing is per unit and is based upon 250 kVa. | Construction Quality: Normal - Not designed for seismic loads | Seismic Installation Conditions: Unanchored equipment that is not vibration isolated Suggested Block Size: 1 EA The following repair consequences are available for this model: **Carbon** .. raw:: html :file: D.50.11.011b-Carbon.html **Cost** .. raw:: html :file: D.50.11.011b-Cost.html **Energy** .. raw:: html :file: D.50.11.011b-Energy.html **Time** .. raw:: html :file: D.50.11.011b-Time.html .. raw:: html
.. raw:: html

D.50.11.011c | Transformer/primary service - Capacity: 350 to <750 kVA - Unanchored equipment that is not vibration isolated - Equipment fragility only

| Costing is per unit and is based upon 500 kVa. | Construction Quality: Normal - Not designed for seismic loads | Seismic Installation Conditions: Unanchored equipment that is not vibration isolated Suggested Block Size: 1 EA The following repair consequences are available for this model: **Carbon** .. raw:: html :file: D.50.11.011c-Carbon.html **Cost** .. raw:: html :file: D.50.11.011c-Cost.html **Energy** .. raw:: html :file: D.50.11.011c-Energy.html **Time** .. raw:: html :file: D.50.11.011c-Time.html .. raw:: html
.. raw:: html

D.50.11.011d | Transformer/primary service - Capacity: 750 to 1500 kVA - Unanchored equipment that is not vibration isolated - Equipment fragility only

| Costing is per unit and is based upon 1000 kVa. | Construction Quality: Normal - Not designed for seismic loads | Seismic Installation Conditions: Unanchored equipment that is not vibration isolated Suggested Block Size: 1 EA The following repair consequences are available for this model: **Carbon** .. raw:: html :file: D.50.11.011d-Carbon.html **Cost** .. raw:: html :file: D.50.11.011d-Cost.html **Energy** .. raw:: html :file: D.50.11.011d-Energy.html **Time** .. raw:: html :file: D.50.11.011d-Time.html .. raw:: html
.. raw:: html

D.50.11.013a | Transformer/primary service - Capacity: <100 kVA - Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints - Anchorage fragility only

| Costing is per unit and is based upon 75 kVa. | Construction Quality: Normal - Designed for seismic loads but no special seismic certification | Seismic Installation Conditions: Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints | Notes: User to provide median demand and dispersion values. The values listed are default PACT values and do not represent the response of this component. Suggested Block Size: 1 EA The following repair consequences are available for this model: **Carbon** .. raw:: html :file: D.50.11.013a-Carbon.html **Cost** .. raw:: html :file: D.50.11.013a-Cost.html **Energy** .. raw:: html :file: D.50.11.013a-Energy.html **Time** .. raw:: html :file: D.50.11.013a-Time.html .. raw:: html
.. raw:: html

D.50.11.013b | Transformer/primary service - Capacity: <100 kVA - Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints - Equipment fragility only

| Costing is per unit and is based upon 75 kVa. | Construction Quality: Normal - Designed for seismic loads but no special seismic certification | Seismic Installation Conditions: Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints Suggested Block Size: 1 EA The following repair consequences are available for this model: **Carbon** .. raw:: html :file: D.50.11.013b-Carbon.html **Cost** .. raw:: html :file: D.50.11.013b-Cost.html **Energy** .. raw:: html :file: D.50.11.013b-Energy.html **Time** .. raw:: html :file: D.50.11.013b-Time.html .. raw:: html
.. raw:: html

D.50.11.013c | Transformer/primary service - Capacity: <100 kVA - Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints - Combined anchorage/isolator & equipment fragility

| Costing is per unit and is based upon 75 kVa. | Construction Quality: Normal - Designed for seismic loads but no special seismic certification | Seismic Installation Conditions: Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints | Notes: User to provide median demand and dispersion values. The values listed are default PACT values and do not represent the response of this component. Suggested Block Size: 1 EA The following repair consequences are available for this model: **Carbon** .. raw:: html :file: D.50.11.013c-Carbon.html **Cost** .. raw:: html :file: D.50.11.013c-Cost.html **Energy** .. raw:: html :file: D.50.11.013c-Energy.html **Time** .. raw:: html :file: D.50.11.013c-Time.html .. raw:: html
.. raw:: html

D.50.11.013d | Transformer/primary service - Capacity: 100 to <350 kVA - Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints - Anchorage fragility only

| Costing is per unit and is based upon 250 kVa. | Construction Quality: Normal - Designed for seismic loads but no special seismic certification | Seismic Installation Conditions: Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints | Notes: User to provide median demand and dispersion values. The values listed are default PACT values and do not represent the response of this component. Suggested Block Size: 1 EA The following repair consequences are available for this model: **Carbon** .. raw:: html :file: D.50.11.013d-Carbon.html **Cost** .. raw:: html :file: D.50.11.013d-Cost.html **Energy** .. raw:: html :file: D.50.11.013d-Energy.html **Time** .. raw:: html :file: D.50.11.013d-Time.html .. raw:: html
.. raw:: html

D.50.11.013e | Transformer/primary service - Capacity: 100 to <350 kVA - Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints - Equipment fragility only

| Costing is per unit and is based upon 250 kVa. | Construction Quality: Normal - Designed for seismic loads but no special seismic certification | Seismic Installation Conditions: Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints Suggested Block Size: 1 EA The following repair consequences are available for this model: **Carbon** .. raw:: html :file: D.50.11.013e-Carbon.html **Cost** .. raw:: html :file: D.50.11.013e-Cost.html **Energy** .. raw:: html :file: D.50.11.013e-Energy.html **Time** .. raw:: html :file: D.50.11.013e-Time.html .. raw:: html
.. raw:: html

D.50.11.013f | Transformer/primary service - Capacity: 100 to <350 kVA - Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints - Combined anchorage/isolator & equipment fragility

| Costing is per unit and is based upon 250 kVa. | Construction Quality: Normal - Designed for seismic loads but no special seismic certification | Seismic Installation Conditions: Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints | Notes: User to provide median demand and dispersion values. The values listed are default PACT values and do not represent the response of this component. Suggested Block Size: 1 EA The following repair consequences are available for this model: **Carbon** .. raw:: html :file: D.50.11.013f-Carbon.html **Cost** .. raw:: html :file: D.50.11.013f-Cost.html **Energy** .. raw:: html :file: D.50.11.013f-Energy.html **Time** .. raw:: html :file: D.50.11.013f-Time.html .. raw:: html
.. raw:: html

D.50.11.013g | Transformer/primary service - Capacity: 350 to <750 kVA - Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints - Anchorage fragility only

| Costing is per unit and is based upon 500 kVa. | Construction Quality: Normal - Designed for seismic loads but no special seismic certification | Seismic Installation Conditions: Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints | Notes: User to provide median demand and dispersion values. The values listed are default PACT values and do not represent the response of this component. Suggested Block Size: 1 EA The following repair consequences are available for this model: **Carbon** .. raw:: html :file: D.50.11.013g-Carbon.html **Cost** .. raw:: html :file: D.50.11.013g-Cost.html **Energy** .. raw:: html :file: D.50.11.013g-Energy.html **Time** .. raw:: html :file: D.50.11.013g-Time.html .. raw:: html
.. raw:: html

D.50.11.013h | Transformer/primary service - Capacity: 350 to <750 kVA - Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints - Equipment fragility only

| Costing is per unit and is based upon 500 kVa. | Construction Quality: Normal - Designed for seismic loads but no special seismic certification | Seismic Installation Conditions: Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints Suggested Block Size: 1 EA The following repair consequences are available for this model: **Carbon** .. raw:: html :file: D.50.11.013h-Carbon.html **Cost** .. raw:: html :file: D.50.11.013h-Cost.html **Energy** .. raw:: html :file: D.50.11.013h-Energy.html **Time** .. raw:: html :file: D.50.11.013h-Time.html .. raw:: html
.. raw:: html

D.50.11.013i | Transformer/primary service - Capacity: 350 to <750 kVA - Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints - Combined anchorage/isolator & equipment fragility

| Costing is per unit and is based upon 500 kVa. | Construction Quality: Normal - Designed for seismic loads but no special seismic certification | Seismic Installation Conditions: Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints | Notes: User to provide median demand and dispersion values. The values listed are default PACT values and do not represent the response of this component. Suggested Block Size: 1 EA The following repair consequences are available for this model: **Carbon** .. raw:: html :file: D.50.11.013i-Carbon.html **Cost** .. raw:: html :file: D.50.11.013i-Cost.html **Energy** .. raw:: html :file: D.50.11.013i-Energy.html **Time** .. raw:: html :file: D.50.11.013i-Time.html .. raw:: html
.. raw:: html

D.50.11.013j | Transformer/primary service - Capacity: 750 to 1500 kVA - Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints - Anchorage fragility only

| Costing is per unit and is based upon 1000 kVa. | Construction Quality: Normal - Designed for seismic loads but no special seismic certification | Seismic Installation Conditions: Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints | Notes: User to provide median demand and dispersion values. The values listed are default PACT values and do not represent the response of this component. Suggested Block Size: 1 EA The following repair consequences are available for this model: **Carbon** .. raw:: html :file: D.50.11.013j-Carbon.html **Cost** .. raw:: html :file: D.50.11.013j-Cost.html **Energy** .. raw:: html :file: D.50.11.013j-Energy.html **Time** .. raw:: html :file: D.50.11.013j-Time.html .. raw:: html
.. raw:: html

D.50.11.013k | Transformer/primary service - Capacity: 750 to 1500 kVA - Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints - Equipment fragility only

| Costing is per unit and is based upon 1000 kVa. | Construction Quality: Normal - Designed for seismic loads but no special seismic certification | Seismic Installation Conditions: Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints Suggested Block Size: 1 EA The following repair consequences are available for this model: **Carbon** .. raw:: html :file: D.50.11.013k-Carbon.html **Cost** .. raw:: html :file: D.50.11.013k-Cost.html **Energy** .. raw:: html :file: D.50.11.013k-Energy.html **Time** .. raw:: html :file: D.50.11.013k-Time.html .. raw:: html
.. raw:: html

D.50.11.013l | Transformer/primary service - Capacity: 750 to 1500 kVA - Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints - Combined anchorage/isolator & equipment fragility

| Costing is per unit and is based upon 1000 kVa. | Construction Quality: Normal - Designed for seismic loads but no special seismic certification | Seismic Installation Conditions: Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints | Notes: User to provide median demand and dispersion values. The values listed are default PACT values and do not represent the response of this component. Suggested Block Size: 1 EA The following repair consequences are available for this model: **Carbon** .. raw:: html :file: D.50.11.013l-Carbon.html **Cost** .. raw:: html :file: D.50.11.013l-Cost.html **Energy** .. raw:: html :file: D.50.11.013l-Energy.html **Time** .. raw:: html :file: D.50.11.013l-Time.html .. raw:: html