D.50.11 - Electrical Service & Distribution - High TensionΒΆ

The following models are available:

D.50.11.011a | Transformer/primary service - Capacity: <100 kVA - Unanchored equipment that is not vibration isolated - Equipment fragility only

Costing is per unit and is based upon 75 kVa.
Construction Quality: Normal - Not designed for seismic loads
Seismic Installation Conditions: Unanchored equipment that is not vibration isolated

Suggested Block Size: 1 EA

The following repair consequences are available for this model:

Carbon

Cost

Energy

Time


D.50.11.011b | Transformer/primary service - Capacity: 100 to <350 kVA - Unanchored equipment that is not vibration isolated - Equipment fragility only

Costing is per unit and is based upon 250 kVa.
Construction Quality: Normal - Not designed for seismic loads
Seismic Installation Conditions: Unanchored equipment that is not vibration isolated

Suggested Block Size: 1 EA

The following repair consequences are available for this model:

Carbon

Cost

Energy

Time


D.50.11.011c | Transformer/primary service - Capacity: 350 to <750 kVA - Unanchored equipment that is not vibration isolated - Equipment fragility only

Costing is per unit and is based upon 500 kVa.
Construction Quality: Normal - Not designed for seismic loads
Seismic Installation Conditions: Unanchored equipment that is not vibration isolated

Suggested Block Size: 1 EA

The following repair consequences are available for this model:

Carbon

Cost

Energy

Time


D.50.11.011d | Transformer/primary service - Capacity: 750 to 1500 kVA - Unanchored equipment that is not vibration isolated - Equipment fragility only

Costing is per unit and is based upon 1000 kVa.
Construction Quality: Normal - Not designed for seismic loads
Seismic Installation Conditions: Unanchored equipment that is not vibration isolated

Suggested Block Size: 1 EA

The following repair consequences are available for this model:

Carbon

Cost

Energy

Time


D.50.11.013a | Transformer/primary service - Capacity: <100 kVA - Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints - Anchorage fragility only

Costing is per unit and is based upon 75 kVa.
Construction Quality: Normal - Designed for seismic loads but no special seismic certification
Seismic Installation Conditions: Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints
Notes: User to provide median demand and dispersion values. The values listed are default PACT values and do not represent the response of this component.

Suggested Block Size: 1 EA

The following repair consequences are available for this model:

Carbon

Cost

Energy

Time


D.50.11.013b | Transformer/primary service - Capacity: <100 kVA - Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints - Equipment fragility only

Costing is per unit and is based upon 75 kVa.
Construction Quality: Normal - Designed for seismic loads but no special seismic certification
Seismic Installation Conditions: Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints

Suggested Block Size: 1 EA

The following repair consequences are available for this model:

Carbon

Cost

Energy

Time


D.50.11.013c | Transformer/primary service - Capacity: <100 kVA - Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints - Combined anchorage/isolator & equipment fragility

Costing is per unit and is based upon 75 kVa.
Construction Quality: Normal - Designed for seismic loads but no special seismic certification
Seismic Installation Conditions: Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints
Notes: User to provide median demand and dispersion values. The values listed are default PACT values and do not represent the response of this component.

Suggested Block Size: 1 EA

The following repair consequences are available for this model:

Carbon

Cost

Energy

Time


D.50.11.013d | Transformer/primary service - Capacity: 100 to <350 kVA - Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints - Anchorage fragility only

Costing is per unit and is based upon 250 kVa.
Construction Quality: Normal - Designed for seismic loads but no special seismic certification
Seismic Installation Conditions: Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints
Notes: User to provide median demand and dispersion values. The values listed are default PACT values and do not represent the response of this component.

Suggested Block Size: 1 EA

The following repair consequences are available for this model:

Carbon

Cost

Energy

Time


D.50.11.013e | Transformer/primary service - Capacity: 100 to <350 kVA - Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints - Equipment fragility only

Costing is per unit and is based upon 250 kVa.
Construction Quality: Normal - Designed for seismic loads but no special seismic certification
Seismic Installation Conditions: Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints

Suggested Block Size: 1 EA

The following repair consequences are available for this model:

Carbon

Cost

Energy

Time


D.50.11.013f | Transformer/primary service - Capacity: 100 to <350 kVA - Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints - Combined anchorage/isolator & equipment fragility

Costing is per unit and is based upon 250 kVa.
Construction Quality: Normal - Designed for seismic loads but no special seismic certification
Seismic Installation Conditions: Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints
Notes: User to provide median demand and dispersion values. The values listed are default PACT values and do not represent the response of this component.

Suggested Block Size: 1 EA

The following repair consequences are available for this model:

Carbon

Cost

Energy

Time


D.50.11.013g | Transformer/primary service - Capacity: 350 to <750 kVA - Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints - Anchorage fragility only

Costing is per unit and is based upon 500 kVa.
Construction Quality: Normal - Designed for seismic loads but no special seismic certification
Seismic Installation Conditions: Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints
Notes: User to provide median demand and dispersion values. The values listed are default PACT values and do not represent the response of this component.

Suggested Block Size: 1 EA

The following repair consequences are available for this model:

Carbon

Cost

Energy

Time


D.50.11.013h | Transformer/primary service - Capacity: 350 to <750 kVA - Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints - Equipment fragility only

Costing is per unit and is based upon 500 kVa.
Construction Quality: Normal - Designed for seismic loads but no special seismic certification
Seismic Installation Conditions: Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints

Suggested Block Size: 1 EA

The following repair consequences are available for this model:

Carbon

Cost

Energy

Time


D.50.11.013i | Transformer/primary service - Capacity: 350 to <750 kVA - Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints - Combined anchorage/isolator & equipment fragility

Costing is per unit and is based upon 500 kVa.
Construction Quality: Normal - Designed for seismic loads but no special seismic certification
Seismic Installation Conditions: Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints
Notes: User to provide median demand and dispersion values. The values listed are default PACT values and do not represent the response of this component.

Suggested Block Size: 1 EA

The following repair consequences are available for this model:

Carbon

Cost

Energy

Time


D.50.11.013j | Transformer/primary service - Capacity: 750 to 1500 kVA - Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints - Anchorage fragility only

Costing is per unit and is based upon 1000 kVa.
Construction Quality: Normal - Designed for seismic loads but no special seismic certification
Seismic Installation Conditions: Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints
Notes: User to provide median demand and dispersion values. The values listed are default PACT values and do not represent the response of this component.

Suggested Block Size: 1 EA

The following repair consequences are available for this model:

Carbon

Cost

Energy

Time


D.50.11.013k | Transformer/primary service - Capacity: 750 to 1500 kVA - Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints - Equipment fragility only

Costing is per unit and is based upon 1000 kVa.
Construction Quality: Normal - Designed for seismic loads but no special seismic certification
Seismic Installation Conditions: Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints

Suggested Block Size: 1 EA

The following repair consequences are available for this model:

Carbon

Cost

Energy

Time


D.50.11.013l | Transformer/primary service - Capacity: 750 to 1500 kVA - Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints - Combined anchorage/isolator & equipment fragility

Costing is per unit and is based upon 1000 kVa.
Construction Quality: Normal - Designed for seismic loads but no special seismic certification
Seismic Installation Conditions: Equipment that is either hard anchored or is vibration isolated with seismic snubbers/restraints
Notes: User to provide median demand and dispersion values. The values listed are default PACT values and do not represent the response of this component.

Suggested Block Size: 1 EA

The following repair consequences are available for this model:

Carbon

Cost

Energy

Time